Policy and Disclosure: 2025 Edition
ID: 389e6f69-c79a-5d5b-b51f-3c4b1e975bbf
STIX ID: report--389e6f69-c79a-5d5b-b51f-3c4b1e975bbf
Feed Name: Google Project Zero
Google Project Zero announces a trial "Reporting Transparency" step added to its existing 90+30 disclosure policy to reduce the upstream patch gap—the delay between an upstream fix and downstream integration—by publicly noting, within about a week of reporting, the vendor/project, affected product, and disclosure timeline without technical details; the goal is to spur faster coordination and patch adoption across ecosystems, with Google Big Sleep also participating.
Your team is not currently subscribed to this feed. You must subscribe to it in order to see this post.
